Area: 1343 m2
Location: “Daivas”, c/o Siľke, Ķekava
Works performed: Roof renovation
Period of work: January 2020 – March 2020
The following were completed within the project:
- roof surface preparation
- laying bitumen vapor insulation with aluminum foil
- laying of thermal insulation
- Melting of the underlay of bitumen roll material with Bipol Standard EPP material
- Smelting of bitumen roll top deck with Bipol EKP material
- assembly of new tin nose elements