Area: 500 m2
Location: 1 Kārļa Street, Jurmala
Works performed: Roof construction with insulation
Period of work: March 2021-April 2021
The following were completed within the project:
- Melting of vapor insulation
- Roof insulation with stone wool 200 mm thick
- Masonry of parapets
- Laying of new waterproofing by melting PVC membrane material Logicroof V-RP 1.5 mm
- Construction of new tin parts
- Construction of new tin gutter systems