Production building, Norway

Building description/customer:Production type building / AS Industriveien 49a

Area:3500 m2

Location: Norway, Trondheim, Industriveien 49a

Works performed: Roof renovation/warming

Period of work:October 2017

An object of increased danger and complexity.
The works were carried out in parallel with providing the building for economic activity.
The following were completed within the project:

  • complete dismantling of the roof covering
  • dismantling of ventilation outlets
  • dismantling of tin parts
  • construction of a new roof structure
  • assembly of new tin corrugated sheets
  • laying of vapor insulation
  • insulation of the roof covering with stone wool Technoroof 200 mm
  • installation of the expanded clay layer forming the slope
  • melting of the underlay of bitumen roll material using premium class material ICOPAL ULTRA BASE 4.0
  • melting of the bitumen roll top deck using premium class material ICOPAL ULTRA TOP 5.0
  • installation of new water drainage systems
  • construction of roof deflectors
  • assembly and sealing of new tin nose elements