Area: 460 m2
Location: Turaidas iela 3, Riga
Works performed: Roof waterproofing melting
Period of work: July 2021 – August 2021
The following were completed within the project:
- Repair of the old roofing
- Laying of new waterproofing by melting bitumen roll material Unfleks EKP 5.0
- Construction of new tin parts
- Construction of a new water drainage system
Roofing restoration works were carried out in parallel with the operation of the building, preventing precipitation from entering the building and not interfering with economic activity.